Maserati 4200cc F136 UC - F136 UD
Engine Overhaul
Assembly Procedure
Insert the cylinder liners into the crankcase, carefully following the coupling sequence used during the liner projection check
To fit the liner fully in its housing, strike the liner evenly along its perimeter using a rubber mallet. The liners must be completely installed within two minutes of the crankcase being removed from the oven.
During the final stage of insertion, carefully ensure that there is no interference between the two adjoining edges on the upper rim of each liner.
Maserati Academy
63
Made with FlippingBook Online newsletter creator